Real Racing 3 Wiki
Real Racing 3 Wiki

Upgrades for LANCIA[]

 !  This upgrade section refers to car upgrade data in RR3 Wiki:Upgrades Section (Classic Version), please refer to post New Template Car Upgrades Including PR [[R/upgradesPR]] for the recommended method to upgrade cars and calculate the PR data  ! 

LANCIA LC2[]


Upgrade Duration PR
R
G
1 Engine: Competition Turbocharger Kit 12 Hours 0.7 132,800 60
2 Engine: Race Prototype Engine Tuning 0.7 - 90
3 Engine: Race Prototype Intake Manifold 1 Day 0.8 298,900 140
4 Engine: Race Prototype Fuel Injectors 0.7 - 210
5 Engine: Race Prototype Throttle Body 2 Days 0.7 672,400 315
1 Drivetrain: Competition Lightweight Differential 12 Hours 0.7 123,600 55
2 Drivetrain: Race-Spec Manual Gearbox 0.6 - 85
3 Drivetrain: Race Prototype Transmission Tuning 1 Day 0.7 278,100 130
4 Drivetrain: Race Prototype Differential 0.7 - 195
5 Drivetrain: Race Prototype Driveshaft 2 Hours 0.7 625,600 295
1 Body: Advanced Body Refinement 12 Hours 0.6 98,200 46
2 Body: Competition Aerodynamic Detailing 0.7 - 65
3 Body: Race Prototype Aero Tweaks 1 Day 0.6 220,900 100
4 Body: Race Prototype Body Refinement 0.6 - 155
1 Suspension: Race-Spec Suspension Tuning 12 Hours 0.8 113,300 50
2 Suspension: Fully Adjustable Race Prototype Shocks 0.8 - 80
3 Suspension: Race Prototype Coil Springs 1 Day 0.9 254,900 120
1 Exhaust: Race-Spec Exhaust Tuning 12 Hours 0.7 112,000 50
2 Exhaust: Race-Spec Turbo Intake Manifold 0.7 - 75
3 Exhaust: Race-Spec Turbo Back Exhaust 1 Day 0.7 252,100 115
4 Exhaust: Race Prototype Exhaust Tuning 0.7 - 175
1 Brakes: Uprated Competition Brake Pads 12 Hours 0.5 86,600 40
2 Brakes: Reinforced Carbon Racing Discs 0.6 - 60
3 Brakes: Advanced Brake Tuning 1 Day 0.5 194,900 90
4 Brakes: Race Prototype Calipers 0.5 - 135
1 Tires & Wheels: Race-Ready Camber & Toe Adjustments 12 Hours 0.8 104,000 48
2 Tires & Wheels: Elite Racing Compound 0.7 - 70
3 Tires & Wheels: Race Prototype Rim 1 Day 0.8 233,900 110
TOTAL: 28
R$-Only Upgrades.   7   (1111111)
All Upgrades.   28   (5543443)
3 Days
12 Hours
4.8
+8.0
+6.4
=19.2
770,500
+3,031,700
=3,802,200
1,395
/ 3,159
PR Base PR w/R$ PR Max
82.5 87.3 101.7
Calculation 87.3 101.7
Difference 0.0 -0.0